Contract 24-533 Chain Link Fencing Project Hameem Area Abu Dhabi. ( Abu Dhabi ) - Ongoing
The process of Gatch Supplying, Laying, Watering, Grading, and Compaction Works is crucial in preparing a stable and strong base for construction projects. Gatch is supplied and laid in layers, followed by watering to achieve optimum moisture content. The surface is then graded for evenness and correct slope, and finally, compaction is performed to ensure the material is stable, dense, and able to support the weight of structures or roadways. This multi-step process ensures a solid foundation that is essential for the durability and safety of the construction.