West to East Pipe Line Project Section 1,2 & 3 (Habshan to Sweihan). Abu Dhabi - Ongoing
The Sand Levelling, Gatch Supplying, Laying, Watering, Grading, and Compaction Work for ROW & Pipeline Trench Excavation, Laying Pipeline & Backfilling Work are all essential steps in the pipeline construction process. These tasks work together to ensure that the pipeline is installed correctly, with a stable foundation and proper protection. Each step—whether it's the preparation of the trench bed, the installation of the pipeline, or the backfilling of the trench—plays a vital role in providing a durable and secure pipeline that will perform efficiently and safely over time.