West to East Pipe Line Project Section 1,2 & 3 (Habshan to Sweihan).  Abu Dhabi - Ongoing

The Sand Levelling, Gatch Supplying, Laying, Watering, Grading, and Compaction Work for ROW & Pipeline Trench Excavation, Laying Pipeline & Backfilling Work are all essential steps in the pipeline construction process. These tasks work together to ensure that the pipeline is installed correctly, with a stable foundation and proper protection. Each step—whether it's the preparation of the trench bed, the installation of the pipeline, or the backfilling of the trench—plays a vital role in providing a durable and secure pipeline that will perform efficiently and safely over time.

PROJECT DETAILS

Name: Habshan & Sweihan – Abu Dhabi
Duration: October, 2024 - Ongoing
Scope: Sand Levelling, Gatch Supplying, Laying, Watering, Grading and Compaction Work for ROW & Pipeline Trench Excavation, Laying Pipeline & Back Filling Work.
Main Contractor:
CIVILCO & BIN ASHEER
Consultant:
Enppi & CPECC
Client:
ADNOC

Company Profile

CONTACT US

Abu Dhabi Office:

Musaffah Industrial Area M-17, Rubowa Alwadi Building block 2 1st Floor Office No 87, 88 P.O.Box: 76780 Abu Dhabi UAE.

Dubai Office:

Ahmed Building 30 Street 7B, Hor Al Anz Duabi UAE.

WorkShop:

Al Vanos Garage Near MAC Hyper Market Mafraq Industrial Area Abu Dhabi UAE.

(+971) 2 6313039

(+971) 50 6295135

www.alvanosgt.com

info@alvanosgt.com

Mon - Sat: 9:00 - 18:00

If you find a high quality constructor for your project?