Contract No: N-17721-132Kv Double OHL Circuit between Taweelah-A and Kizad and all Related Works. ( Kizad Abu Dhabi )
The Gatch Supplying, Laying, Watering, Grading, and Compaction Works are essential for building strong, stable foundations for roads and tower pads. Gatch provides a solid sub-base, and the processes of laying, watering, grading, and compacting ensure that the surface is smooth, stable, and capable of supporting heavy loads. These steps are crucial for ensuring the durability and longevity of the infrastructure, helping to prevent future issues like settlement, cracking, or instability. Each phase must be carefully executed to meet engineering standards and ensure a successful construction project.